The routes are all in Maoming City, Guangdong Province. The two-way four-lane technical standard with a design speed of 100 km/h is adopted, and the subgrade width is 26 meters. The total length of the project is about 121.91 kilometers, and it is planned to be completed and opened to traffic in October 2015.
Application unit: China Railway Seventeenth BureauPrev: No more